Basic project information

Project name

The sludge mixing project of the coal -fired units

Project code

2407-639102-04-05-267606

Code time

2024-07-09

Project code agency

Ganhe Industrial Park Economic and Science and Technology Development Bureau

Administrative Division

Ganhe Industrial Park

Creation time

2024-07-09

Project construction location

Ganhe Industrial Park

Detailed location of the project

Xining Economic and Technological Development Zone Ganhe Industrial Park Xining Power Power Branch

Project declaration time

2024-07-09

Audit type

File type

National standard industry

Fire power generation

Project industry

Electricity

Industrial structure adjustment guidance directory

Film power generation low -carbon energy saving transformation coal -fired generating units of carbon dioxide capture、Utilize and seal (CCUS) technology,Ultra -low emissions、Has pollution -based cooperative governance technology such as heavy metal removal,Development and application of carbon reduction coordination technology development and application,Energy Latest football odds for Euro 2024-saving carbon reduction reconstruction of thermal power generation crew、Heating renovation、Flexible transformation,Coal -electrical unit in -depth peak adjustment safety prevention technology research and development and application

Project attribute

State -owned Holdings Project

Construction Nature

Other

Construction content and scale

(1) The building area of ​​the sludge disposal engineering building in the sludge storage area & nbsp; 33m Latest match predictions for the 2024 European Cup× 32m,Among them, the sludge storage area 32M × 19m。 (2) The wet sludge of the feeding system is increased through the sludge grabbing method to the buffer warehouse arranged on the horizontal ground,The effective volume of the buffer warehouse is 25m³,The top height is 5m。 (3) The amount of doping is about 400 tons/day。 Construction content & nbsp;Small sludge storage area、System、Devuling System、Electric System、Control System、Video monitoring Euro Cup today match livesystem、Lighting System、Fire System。

I plan to start work

2024-09

It is intended to build time

2025-02

Total investment of the project (10,000 yuan)

1367

Whether foreign investment

Internal capital

& nbsp;

Project application unit

Unit name

Qinghai Yellow River Hydropower Development Co., Ltd. Xining Power Generation Branch

Certificate type

Unified social credit code

Photo license number

91633000059141270t

Contact

Kou Zhichao

Project legal person unit

Project unit

Qinghai Yellow River Hydropower Development Co., Ltd. Xining Power Generation Branch

Certificate type

Unified social credit code

Photo license number

91633000059141270t

Contact

Kou Zhichao

& nbsp;


& nbsp

Contact number: 0971-6304393